{"id":2523,"date":"2026-06-15T07:34:49","date_gmt":"2026-06-15T07:34:49","guid":{"rendered":"https:\/\/hongtengdaparts.com\/?post_type=product&#038;p=2523"},"modified":"2026-09-13T14:42:37","modified_gmt":"2026-09-13T14:42:37","slug":"bomba-hidraulica-principal-hitachi-ex400-ex400-1","status":"publish","type":"product","link":"https:\/\/www.hongtengdaparts.com\/es\/product\/hitachi-ex400-ex400-1-hydraulic-main-pump\/","title":{"rendered":"Bomba hidr\u00e1ulica principal Hitachi EX400 \/ EX400-1 \u2013 Remanufacturada en China (4622371 \/ 4246412)"},"content":{"rendered":"<h3>Informaci\u00f3n detallada<\/h3>\n<table border=\"1\" cellpadding=\"5\">\n<tbody>\n<tr>\n<th>Par\u00e1metro<\/th>\n<th>Valor<\/th>\n<th>Nota<\/th>\n<\/tr>\n<tr>\n<td><b>Origen<\/b><\/td>\n<td>China<\/td>\n<td>Remanufacturado<\/td>\n<\/tr>\n<tr>\n<td><b>Garant\u00eda<\/b><\/td>\n<td>3 a 6 meses seg\u00fan los detalles del producto; no ofrecemos garant\u00eda para productos originales y usados.<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<tr>\n<td><b>Cantidad m\u00ednima de pedido<\/b><\/td>\n<td>1 unidad<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<tr>\n<td><b>Producci\u00f3n Mensual<\/b><\/td>\n<td>300 piezas\/mes<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<tr>\n<td><b>Detalles del embalaje<\/b><\/td>\n<td>Embalaje en caja de madera o personalizado<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<tr>\n<td><b>Condiciones de pago<\/b><\/td>\n<td>Transferencia bancaria, Western Union, PayPal, Western Union<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<tr>\n<td><b>Plazo de entrega<\/b><\/td>\n<td>5-8 d\u00edas h\u00e1biles (dependiendo de la situaci\u00f3n del pedido)<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<tr>\n<td><b>M\u00e9todo de Env\u00edo<\/b><\/td>\n<td>Flete mar\u00edtimo, flete a\u00e9reo o mediante DHL\/FEDEX\/TNT\/EMS<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<tr>\n<td><b>Medidas de Garant\u00eda<\/b><\/td>\n<td>Inspeccionamos el producto y enviamos fotos detalladas al comprador para su confirmaci\u00f3n.<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Nota: La informaci\u00f3n de aplicaci\u00f3n proporcionada es solo de referencia. Confirme el n\u00famero de pieza y comp\u00e1relo con el componente antiguo antes de comprar. Si tiene alguna pregunta, no dude en\u00a0<a href=\"https:\/\/www.hongtengdaparts.com\/es\/contactenos\/\">Cont\u00e1ctenos<\/a>.<\/strong><br \/>\n<strong>Vale la pena elegir un producto que ofrezca un rendimiento estable, alta fiabilidad, f\u00e1cil instalaci\u00f3n y respuesta r\u00e1pida.<\/strong><\/p>\n<h3><span class=\"\">El dilema de las 40 toneladas: \u00bfReparar, reemplazar o arriesgarse?<\/span><\/h3>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Usted tiene una EX400 o EX400-1 que ha perdido su rendimiento. La pluma se eleva m\u00e1s lentamente de lo que sol\u00eda hacerlo. La rotaci\u00f3n duda. El aceite se calienta demasiado. El mec\u00e1nico dice que \u201cla bomba est\u00e1 cansada\u201d. Ahora se enfrenta a la misma decisi\u00f3n que todo propietario de una m\u00e1quina de 40 toneladas m\u00e1s antigua:<\/span><\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Comprar una nueva original<\/span><\/strong><span class=\"\">\u00a0\u2013 Seguro, pero el precio podr\u00eda comprar un autom\u00f3vil peque\u00f1o. Dif\u00edcil de justificar en una m\u00e1quina que ya tiene m\u00e1s de 10,000 horas.<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Comprar una bomba usada<\/span><\/strong><span class=\"\">\u00a0\u2013 Barata al principio, pero no tiene idea de cu\u00e1ntas horas tiene, si funcion\u00f3 con aceite contaminado o si sus cojinetes ya est\u00e1n picados. Est\u00e1 comprando la falla oculta de otra persona.<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Enviar su bomba a \u201creparar\u201d<\/span><\/strong><span class=\"\">\u00a0\u2013 Generalmente significa un juego de sellos y pintura. Volver\u00e1 a tener fugas en 500 horas.<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Elegir una bomba remanufacturada adecuada<\/span><\/strong><span class=\"\">\u00a0\u2013 Aqu\u00ed es donde va el dinero inteligente. Pero solo si el proceso de remanufactura realmente reemplaza las piezas correctas.<\/span><\/p>\n<\/li>\n<\/ul>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Hablemos de lo que realmente significa \u201cremanufacturado\u201d \u2013 y por qu\u00e9 la mayor\u00eda de los talleres lo hacen mal.<\/span><\/strong><\/p>\n<h3><span class=\"\">El mito del \u201cre-sellado\u201d<\/span><\/h3>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Muchos talleres hidr\u00e1ulicos ofrecen bombas \u201creconstruidas\u201d. Desmontan, limpian, reemplazan juntas t\u00f3ricas y sellos de eje, aplican pintura nueva y lo dan por terminado. \u00bfEl problema? El bloque de cilindros y la placa de v\u00e1lvulas siguen desgastados. Los cojinetes siguen fatigados. Las zapatas de los pistones siguen rayadas. En 500\u20131,000 horas, la fuga interna regresa, la temperatura del aceite sube y usted pierde potencia nuevamente. Pag\u00f3 por una curita, no por una soluci\u00f3n.<\/span><\/p>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Nuestro proceso de remanufactura es diferente porque partimos de una verdad simple: el metal desgastado no se desgasta solo. Debe reemplazarlo.<\/span><\/strong><\/p>\n<h3><span class=\"\">Lo que realmente reemplazamos (no solo limpiamos)<\/span><\/h3>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Cuando remanufacturamos su bomba EX400\/EX400-1 (OEM 4622371 \/ 4246412), cada uno de estos componentes es inspeccionado y casi siempre reemplazado:<\/span><\/p>\n<div class=\"ds-scroll-area ds-scroll-area--show-on-focus-within ds-scroll-area--enabled _1210dd7 c03cafe9\">\n<table>\n<thead>\n<tr>\n<th><span class=\"\">Componente<\/span><\/th>\n<th><span class=\"\">Por qu\u00e9 falla<\/span><\/th>\n<th><span class=\"\">Qu\u00e9 hacemos<\/span><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><span class=\"\">Bloque de cilindros<\/span><\/td>\n<td><span class=\"\">Rayaduras por aceite contaminado<\/span><\/td>\n<td><span class=\"\">Rectificar o reemplazar<\/span><\/td>\n<\/tr>\n<tr>\n<td><span class=\"\">Placa de v\u00e1lvulas<\/span><\/td>\n<td><span class=\"\">Ranuras de desgaste, p\u00e9rdida de planitud<\/span><\/td>\n<td><span class=\"\">Rectificado superficial a una planitud &lt;0.002 mm<\/span><\/td>\n<\/tr>\n<tr>\n<td><span class=\"\">Conjuntos de pistones<\/span><\/td>\n<td><span class=\"\">Desgaste de zapatas, rayaduras en el cilindro<\/span><\/td>\n<td><span class=\"\">Reemplazar como juego emparejado<\/span><\/td>\n<\/tr>\n<tr>\n<td><span class=\"\">Plato oscilante<\/span><\/td>\n<td><span class=\"\">Ranurado por las zapatas de los pistones<\/span><\/td>\n<td><span class=\"\">Reacondicionar o reemplazar<\/span><\/td>\n<\/tr>\n<tr>\n<td><span class=\"\">Cojinetes (todos)<\/span><\/td>\n<td><span class=\"\">Grietas por fatiga debido a ciclos de carga<\/span><\/td>\n<td><span class=\"\">Siempre nuevos \u2013 nunca reutilizados<\/span><\/td>\n<\/tr>\n<tr>\n<td><span class=\"\">Sello de eje<\/span><\/td>\n<td><span class=\"\">Endurecimiento, desgaste del labio<\/span><\/td>\n<td><span class=\"\">Nuevo (caucho fluorado, alta temperatura)<\/span><\/td>\n<\/tr>\n<tr>\n<td><span class=\"\">Todas las juntas t\u00f3ricas y empaques<\/span><\/td>\n<td><span class=\"\">Deformaci\u00f3n por compresi\u00f3n, degradaci\u00f3n qu\u00edmica<\/span><\/td>\n<td><span class=\"\">Nuevos<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Eso es una restauraci\u00f3n completa, no un retoque cosm\u00e9tico.<\/span><\/strong><\/p>\n<h3><span class=\"\">La prueba real: no un eje giratorio, sino una prueba dinamom\u00e9trica bajo carga<\/span><\/h3>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Cualquier bomba puede girarse a mano. Una bomba remanufacturada adecuada debe demostrar su val\u00eda bajo presi\u00f3n de trabajo total. Despu\u00e9s del reensamblaje, cada bomba EX400 que remanufacturamos se coloca en un banco de pruebas hidr\u00e1ulico y se somete a un ciclo de prueba completo:<\/span><\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Rampa de presi\u00f3n hasta 34.3 MPa (4,975 psi)<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Medici\u00f3n de caudal a velocidad nominal<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Verificaci\u00f3n de drenaje de la carcasa (indicador de desgaste interno)<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Tiempo de respuesta de detecci\u00f3n de carga<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Verificaci\u00f3n del corte de presi\u00f3n<\/span><\/p>\n<\/li>\n<\/ul>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Usted recibe un informe de prueba con cifras reales. Sin suposiciones. Sin \u201cse siente fuerte\u201d. Usted ve los datos antes de pagar.<\/span><\/p>\n<h3><span class=\"\">Por qu\u00e9 esto es importante para su EX400 \/ EX400-1<\/span><\/h3>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Su m\u00e1quina pesa 40 toneladas. Mueve miles de metros c\u00fabicos de material cada d\u00eda. Cuando la bomba principal pierde solo un 10% de su eficiencia, usted pierde:<\/span><\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">10\u201315% en tiempo de ciclo<\/span><\/strong><span class=\"\">\u00a0\u2013 carga m\u00e1s lenta, menos camiones por hora<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Mayor consumo de combustible<\/span><\/strong><span class=\"\">\u00a0\u2013 el motor trabaja m\u00e1s para compensar la fuga interna<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Aceite sobrecalentado<\/span><\/strong><span class=\"\">\u00a0\u2013 la energ\u00eda desperdiciada se convierte en calor, cocinando sellos y mangueras<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Fallas impredecibles<\/span><\/strong><span class=\"\">\u00a0\u2013 una bomba cansada no muere lentamente; falla repentinamente<\/span><\/p>\n<\/li>\n<\/ul>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Una bomba remanufacturada adecuada restaura el caudal, la presi\u00f3n y la eficiencia originales. Su EX400 excava como lo hac\u00eda hace 8,000 horas. No \u201ccasi\u201d. No \u201csuficientemente bueno\u201d. Exactamente.<\/span><\/p>\n<h3><span class=\"\">La oferta simple<\/span><\/h3>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Mantenemos bombas EX400\/EX400-1 remanufacturadas (4622371 \/ 4246412) en stock en nuestro almac\u00e9n de Guangzhou. No un n\u00facleo que esperamos reconstruir el pr\u00f3ximo mes. Una unidad terminada, probada, pintada, tapada y lista para montar.<\/span><\/p>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Lo que obtiene:<\/span><\/strong><\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Una bomba restaurada a los est\u00e1ndares de rendimiento OEM<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Cojinetes nuevos, sellos nuevos, superficies de desgaste rectificadas<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Informe de prueba hidr\u00e1ulica disponible bajo solicitud<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Caja de madera resistente, libre de fumigaci\u00f3n, lista para exportaci\u00f3n<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">De 5 a 8 d\u00edas h\u00e1biles a la mayor\u00eda de los destinos globales<\/span><\/p>\n<\/li>\n<\/ul>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Lo que no obtiene:<\/span><\/strong><\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Una bomba usada con pintura nueva<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">\u201cUna apuesta \u201dtal cual\"<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Un parche de 500 horas<\/span><\/p>\n<\/li>\n<\/ul>\n<h3><span class=\"\">Antes de realizar su pedido \u2013 Una foto, un n\u00famero de serie<\/span><\/h3>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Debido a que EX400 y EX400-1 tienen variaciones menores (diferentes ajustes del regulador, diferentes orientaciones de los puertos), necesitamos dos cosas de usted:<\/span><\/p>\n<ol start=\"1\">\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">N\u00famero de serie de la m\u00e1quina<\/span><\/strong><span class=\"\">\u00a0(Comienza con EX400 o EX400-1)<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Una foto clara de la placa de identificaci\u00f3n de la bomba antigua<\/span><\/strong><span class=\"\">\u00a0(Que muestre el n\u00famero de pieza OEM, incluso si est\u00e1 desgastado)<\/span><\/p>\n<\/li>\n<\/ol>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Confirmaremos el ajuste exacto y le enviaremos un presupuesto firme en un plazo de 24 horas. Sin conjeturas. Sin \u201cesto deber\u00eda encajar\u201d.\u201d<\/span><\/p>\n<hr \/>\n<blockquote>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Instalaci\u00f3n en lenguaje sencillo:<\/span><\/strong><br \/>\n<span class=\"\">\u2013 La peque\u00f1a l\u00ednea de drenaje de la bomba al tanque debe estar abierta. Si est\u00e1 pinzada o bloqueada, se acumular\u00e1 presi\u00f3n dentro de la bomba y romper\u00e1 el sello del eje principal la primera vez que encienda el motor.<\/span><br \/>\n<span class=\"\">\u2013 Antes de atornillar la bomba nueva, cambie todos los filtros hidr\u00e1ulicos y lave el tanque si la bomba antigua fall\u00f3 de manera catastr\u00f3fica (metal en el aceite). Los residuos destruyen una bomba reconstruida tan r\u00e1pido como una nueva.<\/span><br \/>\n<span class=\"\">\u2013 Use arandelas de cobre o juntas t\u00f3ricas nuevas en cada conexi\u00f3n de manguera. Los sellos viejos tendr\u00e1n fugas.<\/span><br \/>\n<span class=\"\">\u2013 Despu\u00e9s de la instalaci\u00f3n, deje el motor en ralent\u00ed durante unos minutos y mueva lentamente cada palanca (pluma, brazo, cuchara, giro, desplazamiento) para purgar el aire del sistema. La m\u00e1quina puede estar lenta al principio \u2013 eso es normal.<\/span><\/p>\n<\/blockquote>\n<blockquote>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Garant\u00eda \u2013 honesta y transparente:<\/span><\/strong><br \/>\n<span class=\"\">El per\u00edodo de garant\u00eda es de 3 a 6 meses seg\u00fan los detalles del producto.\u00a0<\/span><strong><span class=\"\">No proporcionamos garant\u00eda para piezas originales usadas o remanufacturadas.<\/span><\/strong><span class=\"\">\u00a0Creemos en hacer el trabajo correctamente antes de enviar, no en prometer repararlo despu\u00e9s. Nuestro valor est\u00e1 en el trabajo: piezas nuevas, ensamblaje preciso, pruebas completas y fotos antes del despacho. Si necesita una garant\u00eda tradicional, cons\u00faltenos sobre opciones nuevas de posventa.<\/span><\/p>\n<\/blockquote>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Su EX400 o EX400-1 tiene a\u00f1os de trabajo por delante. La bomba principal no deber\u00eda ser la raz\u00f3n para dejarlo estacionado. Env\u00edenos los detalles de su m\u00e1quina \u2013 le conseguiremos una bomba reconstruida que realmente funcione.<\/span><\/strong><\/p>","protected":false},"excerpt":{"rendered":"<table border=\"1\" cellpadding=\"5\">\n<tbody>\n<tr>\n<th>Par\u00e1metro<\/th>\n<th>Valor<\/th>\n<\/tr>\n<tr>\n<td><b>Modelo compatible<\/b>}]<\/td>\n<td>EX400, EX400-1<\/td>\n<\/tr>\n<tr>\n<td><b>Nombre del producto<\/b><\/td>\n<td>Bomba hidr\u00e1ulica Hitachi<\/td>\n<\/tr>\n<tr>\n<td><b>N\u00fameros de pieza<\/b><\/td>\n<td>4622371, 4246412<\/td>\n<\/tr>\n<tr>\n<td><b>Tipo de Producto<\/b><\/td>\n<td>Bomba hidr\u00e1ulica<\/td>\n<\/tr>\n<tr>\n<td><b>Categor\u00eda<\/b><\/td>\n<td>Sistema Hidr\u00e1ulico<\/td>\n<\/tr>\n<tr>\n<td><b>Marca<\/b><\/td>\n<td>HTD<\/td>\n<\/tr>\n<\/tbody>\n<\/table>","protected":false},"featured_media":2527,"template":"","meta":[],"product_brand":[],"product_cat":[68],"product_tag":[407,488,152,263],"class_list":["post-2523","product","type-product","status-publish","has-post-thumbnail","product_cat-hitachi-hydraulic-pump","product_tag-407","product_tag-ex400","product_tag-hitachi","product_tag-hydraulic-pump","first","instock","shipping-taxable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/www.hongtengdaparts.com\/es\/wp-json\/wp\/v2\/product\/2523","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hongtengdaparts.com\/es\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/www.hongtengdaparts.com\/es\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hongtengdaparts.com\/es\/wp-json\/wp\/v2\/media\/2527"}],"wp:attachment":[{"href":"https:\/\/www.hongtengdaparts.com\/es\/wp-json\/wp\/v2\/media?parent=2523"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/www.hongtengdaparts.com\/es\/wp-json\/wp\/v2\/product_brand?post=2523"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/www.hongtengdaparts.com\/es\/wp-json\/wp\/v2\/product_cat?post=2523"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/www.hongtengdaparts.com\/es\/wp-json\/wp\/v2\/product_tag?post=2523"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}