Description
Detail Information
| Payment Terms: T/T, XT, Paypal, Western Union | Supply Capacity: 500 pieces/month | Applicable Industries: Machinery Repair Shops, Retail, Construction, Energy, Mining |
| Category: Cab Assembly | Application: For Kobelco Earthmoving Machinery Excavators | Highlights: Excavator Replacement Parts, Excavator Cab Components |
| Shipping: Sea freight / Air freight |
Note: The application information provided is for reference only. Please confirm the part number and compare it with the old component before purchasing. If you have any questions, please feel free to contact us.
It is worth choosing a product that features stable performance, high reliability, easy installation, and quick response.
Ordering a bulky item like an excavator cab from overseas can feel risky. Will it fit? Will it arrive damaged? How long will shipping take?
Here is exactly what happens when you order the Kobelco Super 8 cab from Hongtengda Parts – no guesswork, no surprises.
1. Before you pay: we verify fitment with your machine
We do not assume “Super 8” covers all variants. You send us:
-
Machine serial number plate photo
-
Two photos of the damaged cab (front and side)
-
Any visible mounting differences (if modified before)
✅ Within 2 hours we confirm yes/no compatibility. If no, we find the right cab for you.
2. Production & quality check – you see it before it ships
| Step | What we do | What you receive |
|---|---|---|
| Pre‑production | Weld frame on jig | – |
| Painting | Zinc primer + topcoat, thickness measured | Paint video clip |
| Glass installation | Rubber seals pressed, water spray test | Seal test video |
| Final inspection | Dimensional check against jig, door operation test | 10‑photo set + summary report |
📌 You approve or request adjustments before we pack.
3. Packing for sea/air freight – built for rough handling
-
Wooden case: 15mm thick plywood, steel strapping, fumigation‑free (ISPM15 certified).
-
Internal bracing: Foam padding at corners + plastic sheeting against moisture.
-
Labeling: “DO NOT STACK” + “GLASS” + machine model on two sides.
We have shipped cabs to over 20 countries. Damage rate <0.5% in 2024.
4. Delivery time & cost examples (estimated)
| Destination | Sea freight (FOB Guangzhou) | Air freight (to major airport) |
|---|---|---|
| Indonesia (Jakarta) | 12–14 days | 3–4 days |
| Nigeria (Lagos) | 28–32 days | 5–6 days |
| Peru (Callao) | 32–38 days | 5–7 days |
| UAE (Dubai) | 18–22 days | 4–5 days |
💰 Tip: Sea freight is cheaper for 2+ units. Air freight recommended for urgent 1‑piece orders.
5. What customers say about our Kobelco cabs
“Received in Manila in 13 days. Case had one scratch, but cab inside perfect. Door aligned first try.” – R. Cruz, Philippines
“They marked the bolt holes on the frame – saved us 2 hours of searching. Smart.” – A. Hassan, Tanzania
6. Quick reference
| Item | Detail |
|---|---|
| Model | Kobelco Super 8 series (full size cab) |
| MOQ | 1 piece |
| Lead time | 6–8 working days |
| Payment | T/T, XTransfer, PayPal, Western Union |
| Supply capacity | 500 pcs/month |
| Warranty | 6 months (manufacturing defects only) |











